All Issue

2023 Vol.2, Issue 4

Research Article

29 December 2023. pp. 1-16
Abstract
References
1
AbouRizk, S. M., Hague, S., and Ekyalimpa, R. (2016). Construction simulation: An introduction using Simphony. University of Alberta, Edmonton.
2
Baek, H. G. (2011). Factor Based Optimization of Earthwork for Land Development Projects.
3
Beak, K. G. (2010). A study of an Algorithm to Estimate the Best Optimal Haul Route in Construction of Complex Area Based on GIS.
4
Gwak, H. S. (2016). Optimal Haul-route Searching and Earth Allocation System for Building Earthwork Planning.
5
Kwon, Y. M. (2016). Productivity Analysis on Real-time Path of Dumps using GPS Monitoring.
6
Lee, H. J. (2016). Development of quantity take-off and construction equipment monitoring system using BIM.
7
Lee, H. J., Kwon, Y. M., Yoon, C. W., and Seo, J. W. (2016). Productivity Analysis on Real-time Path Monitoring of Dumps. 10.12652/Ksce.2016.36.3.0565
8
Yin, J. (2017). Development of Dump Truck Cycle Number Calculation Module Using Ray Casting Algorithm.
Information
  • Publisher :Korean Society of Automation and Robotics in Construction
  • Publisher(Ko) :(사)한국건설자동화·로보틱스학회
  • Journal Title :Journal of Construction Automation and Robotics
  • Journal Title(Ko) :건설자동화·로보틱스 논문집
  • Volume : 2
  • No :4
  • Pages :1-16
  • Received Date : 2023-11-20
  • Revised Date : 2023-12-19
  • Accepted Date : 2023-12-28