All Issue

2022 Vol.1, Issue 2 Preview Page
8 July 2022. pp. 7-12
Abstract
References
1
Chapman, R. E., and Butry, D. T. (2008). Measuring and improving the productivity of the US construction industry: Issues, challenges, and opportunities. National Institute of Standards and Technology, Gaithersburg, MD.
2
Chi, S., and Caldas, C. H. (2011). Automated object identification using optical video cameras on construction sites. Computer‐Aided Civil and Infrastructure Engineering, 26(5), pp. 368-380. 10.1111/j.1467-8667.2010.00690.x
3
Davidson, I. N., and Skibniewski, M. J. (1995). Simulation of automated data collection in buildings. Journal of Computing in Civil Engineering, 9(1), pp. 9-20. 10.1061/(ASCE)0887-3801(1995)9:1(9)
4
Gong, J., and Caldas, C. H. (2010). Computer vision-based video interpretation model for automated productivity analysis of construction operations. Journal of Computing in Civil Engineering, 24(3), pp. 252-263. 10.1061/(ASCE)CP.1943-5487.0000027
5
Gong, J., Caldas, C. H., and Gordon, C. (2011). Learning and classifying actions of construction workers and equipment using Bag-of-Video-Feature-Words and Bayesian network models. Advanced Engineering Informatics, 25(4), pp. 771-782. 10.1016/j.aei.2011.06.002
6
Gouett, M. C., Haas, C. T., Goodrum, P. M., and Caldas, C. H. (2011). Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117-1124. 10.1061/(ASCE)CO.1943-7862.0000375
7
Hwang, B. G., and Soh, C. K. (2013). Trade-level productivity measurement: Critical challenges and solutions. Journal of Construction Engineering and Management, 139(11), 04013013. 10.1061/(ASCE)CO.1943-7862.0000761
8
Kwon, J., and Huh, Y. (2021). Productivity Analysis of Reinforced Concrete Works and Tower Crane Working Ratio for High-rise Apartment Buildings. Korean Journal of Construction Engineering and Management, 22(1), pp. 55-62.
9
McCulloch, B. (1997). Automating field data collection in construction organizations. In Construction Congress V: Managing Engineered Construction in Expanding Global Markets (pp. 957-963). ASCE.
10
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction. Mcgraw-Hill College.
Information
  • Publisher :Korean Society of Automation and Robotics in Construction
  • Publisher(Ko) :(사)한국건설자동화·로보틱스학회
  • Journal Title :Journal of Construction Automation and Robotics
  • Journal Title(Ko) :건설자동화·로보틱스 논문집
  • Volume : 1
  • No :2
  • Pages :7-12
  • Received Date : 2022-06-23
  • Revised Date : 2022-07-06
  • Accepted Date : 2022-07-08