All Issue

2022 Vol.1, Issue 2
8 July 2022. pp. 1-6
Abstract
References
1
Assadzadeh, A., Arashpour, M., Brilakis, I., Ngo, T., and Konstantinou, E. (2022). Vision-based excavator pose estimation using synthetically generated datasets with domain randomization. Automation in Construction, 134, 104089. 10.1016/j.autcon.2021.104089
2
Braun, A., and Borrmann, A. (2019). Combining inverse photogrammetry and BIM for automated labeling of construction site images for machine learning. Automation in Construction, 106, 102879. 10.1016/j.autcon.2019.102879
3
Hong, Y., Park, S., Kim, H., and Kim, H. (2021). Synthetic data generation using building information models. Automation in Construction, 130, 103871. 10.1016/j.autcon.2021.103871
4
Hwang, J., Kim, J., Chi, S., and Seo, J. (2022). Development of training image DB using web crawling for construction site monitoring. Automation in Construction, 135, 104141. 10.1016/j.autcon.2022.104141
5
Kim, D., Liu, M., Lee, S., and Kamat, V. R. (2019). Remote proximity monitoring between mobile construction resources using camera-mounted UAVs. Automation in Construction, 99, pp. 168-182. 10.1016/j.autcon.2018.12.014
6
Kim, J., and Chi, S. (2021). A few-shot learning approach for database-free vision-based monitoring on construction sites. Automation in Construction, 124, 103566. 10.1016/j.autcon.2021.103566
7
Kim, J., Chi, S., and Ahn, C. R. (2021). Hybrid kinematic-visual sensing approach for activity recognition of construction equipment. Journal of Building Engineering, 44, 102709. 10.1016/j.jobe.2021.102709
8
Kim, J., Hwang, J., Chi, S., and Seo, J. (2020). Towards database-free vision-based monitoring on construction sites: A deep active learning approach. Automation in Construction, 120, 103376. 10.1016/j.autcon.2020.103376
9
Kim, Y., Kim, H., Murphy, R., Lee, S., and Ahn, C. R. (2022). Delegation or collaboration: Understanding different construction stakeholders' perceptions of robotization. Journal of Management in Engineering, 38(1), 04021084. 10.1061/(ASCE)ME.1943-5479.0000994
10
Liang, C.-J., Wang, X., Kamat, V. R., and Menassa, C. C. (2021). Human-robot collaboration in construction: Classification and research trends. Journal of Construction Engineering and Management, 147(10), 03121006. 10.1061/(ASCE)CO.1943-7862.0002154
11
Loper, M., Mahmood, N., Romero, J., Pons-Moll, G., and Black, M. J. (2015). SMPL: A skinned multi-person linear model. ACM Transactions on Graphics, 34(6), pp. 1-16. 10.1145/2816795.2818013
12
Mahmood, B., Han, S. U., and Seo, J. (2022). Implementation experiments on convolutional neural network training using synthetic images for 3D pose estimation of an excavator on real images. Automation in Construction, 133, 103996. 10.1016/j.autcon.2021.103996
13
Siu, C., Wang, M., and Cheng, J. C. P. (2022). A framework for synthetic image generation and augmentation for improving automatic sewer pipe defect detection. Automation in Construction, 137, 104213. 10.1016/j.autcon.2022.104213
14
Soltani, M., Zhu, Z., and Hammad, A. (2016). Automated annotation for visual recognition of construction resources using synthetic images. Automation in Construction, 62, pp. 14-23. 10.1016/j.autcon.2015.10.002
15
Torres Calderon, W., Roberts, D., and Golparvar-Fard, M. (2021). Synthesizing pose sequences from 3D assets for vision-based activity analysis. Journal of Computing in Civil Engineering, 35(1), 04020052. 10.1061/(ASCE)CP.1943-5487.0000937
16
Varol, G., Romero, J., Martin, X., Mahmood, N., Black, M. J., Laptev, I., and Schmid, C. (2017). Learning from synthetic humans. Proc. of 2017 IEEE Conference on Computer Vision and Pattern Recognition, IEEE, Honolulu, HI, USA, pp. 109-117. 10.1109/CVPR.2017.492
Information
  • Publisher :Korean Society of Automation and Robotics in Construction
  • Publisher(Ko) :(사)한국건설자동화·로보틱스학회
  • Journal Title :Journal of Construction Automation and Robotics
  • Journal Title(Ko) :건설자동화·로보틱스 논문집
  • Volume : 1
  • No :2
  • Pages :1-6
  • Received Date : 2022-06-20
  • Revised Date : 2022-07-06
  • Accepted Date : 2022-07-06