All Issue

2023 Vol.2, Issue 1
14 April 2023. pp. 1-6
Abstract
References
1
Choi, Y. J., Park, S., and Kim, S. Y. (2022). GCP-Based Automated Fine Alignment Method for Improving the Accuracy of Coordinate Information on UAV Point Cloud Data. Sensors, 22(22), 8735. 10.3390/s2222873536433331PMC9699057
2
Julge, K., Ellmann, A., and Köök, R. (2019). Unmanned aerial vehicle surveying for monitoring road construction earthworks. The Baltic Journal of Road And Bridge Engineering, 14(1), pp. 1-17. 10.7250/bjrbe.2019-14.430
3
Kim, Y. G., Park, S. Y., and Kim, S. (2022). Development of Registration Post-Processing Technology to Homogenize the Density of the Scan Data of Earthwork Sites. KSCE Journal of Civil and Environmental Engineering Research, 42(5), pp. 689-699.
4
Kim, J., Lee, J., Park, S., and Ko, K. (2018). A Modified Method for Registration of 3D Point Clouds with a Low Overlap Ratio. Journal of the Korea Computer Graphics Society, 24(5), pp. 11-19. 10.15701/kcgs.2018.24.5.11
5
Kim, S., and Park, J. W. (2015). Analysis of accuracy and productivity of terrestrial laser scanner for earthwork. The Journal of the Korea Contents Association, 15(10), pp. 587-596. 10.5392/JKCA.2015.15.10.587
6
Park, S. Y., and Kim, S. (2020). Performance Evaluation of Denoising Algorithms for the 3D. Journal of KIBIM, 10, pp. 32-39.
7
Park, S. Y., and Kim, S. (2021). Analysis of overlap ratio for registration accuracy improvement of 3D point cloud data at construction sites. Journal of KIBIM, 11(5), pp. 1-9.
8
Qin, R. (2014). Change detection on LOD 2 building models with very high resolution spaceborne stereo imagery. ISPRS Journal of Photogrammetry and Remote Sensing, 96, pp. 179-192. 10.1016/j.isprsjprs.2014.07.007
9
Wang, Q., and Kim, M. K. (2019). Applications of 3D point cloud data in the construction industry: A fifteen-year review from 2004 to 2018. Advanced Engineering Informatics, 39, pp. 306-319. 10.1016/j.aei.2019.02.007
Information
  • Publisher :Korean Society of Automation and Robotics in Construction
  • Publisher(Ko) :(사)한국건설자동화·로보틱스학회
  • Journal Title :Journal of Construction Automation and Robotics
  • Journal Title(Ko) :건설자동화·로보틱스 논문집
  • Volume : 2
  • No :1
  • Pages :1-6
  • Received Date : 2023-03-02
  • Revised Date : 2023-03-21
  • Accepted Date : 2023-03-22